메뉴 건너뛰기

조회 수 169245 추천 수 0 댓글 0
?

단축키

Prev이전 문서

Next다음 문서

크게 작게 위로 아래로 댓글로 가기 인쇄
?

단축키

Prev이전 문서

Next다음 문서

크게 작게 위로 아래로 댓글로 가기 인쇄

https://www.youtube.com/watch?feature=player_embedded&v=4mPMeoQuegI

Aasta Hansteen Templates

Earlier this year, a new Norwegian depth record was set by EMAS AMC with the installation of three Aasta Hansteen subsea templates on the seabed, built at Aker Solution in Sandnessjøen.

The 138.5 meters long subsea construction vessel BOA Sub C was selected for the transport and installation of two 4-slot templates and one single-slot template.

Gas from the Aasta Hansteen discovery, made in 1997, will be exported through Polarled, a new 480-kilometre gas pipeline from Aasta Hansteen to Nyhamna in Møre og Romsdal county.


  1. No Image 11Mar
    by v7korea
    2019/03/11 by v7korea
    Views 265 

    Honeywell Miller - Ansi z359 코드에 대한 이해

  2. No Image 07Dec
    by v7korea
    2017/12/07 by v7korea
    Views 241 

    Vertical 7 korea youtube Chanell open..

  3. No Image 16Jun
    by v7korea
    2016/06/16 by v7korea
    Views 518 

    [풍력발전] 블레이드 검사 및 수리 동영상

  4. No Image 08Mar
    by v7korea
    2016/03/08 by v7korea
    Views 169245 

    [HHI] Aasta Hansteen Project의 이해

  5. No Image 25Jan
    by v7korea
    2016/01/25 by v7korea
    Views 293 

    [Wind genarator의 이해] Offshore wind power 설치 동영상

  6. No Image 18Jan
    by v7korea
    2016/01/18 by v7korea
    Views 351 

    카라비너의 형태가 파괴강도에 미치는 영향

  7. No Image 18Jan
    by v7korea
    2016/01/18 by v7korea
    Views 1272 

    [GB] 이종재질 카라비너의 연결시 주의사항 및 훅의 정확한 체결이 중요한 이유

Board Pagination Prev 1 Next
/ 1